M00000127
New product
GMW16530 3rd Edition, February 1, 2018 Summary Document for GM Global Propulsion Systems (GPS) Requirements
In stock
Warning: Last items in stock!
Availability date: 07/27/2021
Description / Abstract:
Introduction
Note: Nothing in this standard supercedes applicable laws and regulations.
Note: In the event of conflict between the English and domestic language, the English language shall take precedence.
Purpose. This standard is a summary of the requirements for the GM Global Propulsion System (GPS) Statement of Requirements (SOR) describing the engineering processes, tasks, events, and deliverables required of the Supplier to provide a product/commodity for the GM GPS Program(s). The SOR takes effect at the time of Supplier selection and continues through the phases of the program(s) identified in 1.2.
Applicability.
Phases of the Program. This SOR will apply throughout the design, development, validation, pre-production, production, and service life phases of the program(s) as described in the SOR appendices. The program(s) schedule(s) will be monitored through the Advanced Product Quality Planning (APQP) and control plan process and reviewed at meetings between representatives of GM and Supplier. Refer to all applicable programs, model years and duration for a product/commodity as described in SOR appendices.
Remarks.
Complete Bill of Material with Cost. The Supplier shall provide completed price breakdowns on forms GM1810 Production Tooling Cost Line-up Form, and GM1804C Piece Cost Breakdown Worksheet to the GM Buyer when the Supplier quotation is submitted.