New Reduced price! View larger

ISO FDIS 16075-3

M00017693

New product

ISO FDIS 16075-3 2015 Edition, March 9, 2015 GUIDELINES FOR TREATED WASTEWATER USE FOR IRRIGATION PROJECTS - PART 3: COMPONENTS OF A REUSE PROJECT FOR IRRIGATION

More details

In stock

$44.10

-55%

$98.00

More info

Description / Abstract: This part of ISO 16075 covers the system's components needed for the use of TWW for irrigation which relate to various pressure and open irrigation systems specifically drip irrigation as this method represents an efficient method of water delivery and water saving. Despite the fact that water quality and filtration of treated wastewater (herein TWW) using drip irrigation are critical, open irrigation systems are more popular and are frequently used for irrigation with TWW and therefore are covered in this part of ISO 16075.

This part of ISO 16075 will cover the issues related to the main components of a TWW irrigation project, including the following:

— pumping station;

— storage reservoirs;

— treatment facilities (for irrigation purposes): filtration and disinfection;

— distribution pipeline network;

— water application devices: irrigation system components and treatment.

None of the parts of this part of ISO 16075 are intended to be used for certification purposes.