M00015493
New product
NFPA (Fire) 85 Boiler and Combustion Systems Hazards Code, 2007 Edition
standard by National Fire Protection Association, 04/01/2007
In stock
Warning: Last items in stock!
Availability date: 07/30/2021
Complete with a time-saving chapter on common requirements for all boilers, NFPA 85 contains important provisions for boiler design, installation, operation, training, and maintenance. Updated for 2007, this comprehensive document applies to the full range of large boilers and systems, including:Large boilers, including atmospheric fluidized bed boilers with a minimum fuel input rating of 12.5 million Btu/hr (3.6 MW)Stoker operationsPulverized fuel systems Fired or unfired steam generators used to recover heat from combustion turbines.
Changes to the 2007 edition include: An expanded scope includes all combustion turbine exhaust systems, not just heat recovery steam generatorsNew requirements for flue gas path auxiliary systems, including, but not limited to ammonia injection, sulfur burners, soot cleaning systems, and electrostatic precipitators
Relocation of furnace structural design requirements from the common section of Chapter 4 into the various related Chapter
New furnace structural design requirements for multiple burner boilers now include the impact of booster fans
Added requirements for fuel gas and fuel oil safety shutoff valves
Consolidation of commissioning and installation requirements into a single section minimizes duplication Product Details
Published: 04/01/2007 Number of Pages: 226